counter stats

San Bonifacio bridge – Fondi (LT)

FRAMEWORK REALIZATION AND INSTALLATION

11 Meter lenght metallic girder bridge with two railways. It was installed on RFI Roma – Formia railway to replace the old one.

CLIENT

micos-logo