FRAMEWORK REALIZATION AND INSTALLATION
The bridge is at metallic grider with double railway with a lenght of 22 meters. It will be installed along the RFI Roma – Napoli railway. The bridge is over Cavata river in the Sermoneta municipality.
COMMITENTE